March 26, 2012 Charlie, Abel and Fernando arrived at 10:00 a.m. They proceeded to remove everything from the bathroom, toilet, fixtures sink and cabinets. They tested the toilet and it was plugged up. They removed the top of the linoleum flooring to reveal the base boards and determined there was no damage to any of the wood below.
Tuesday, February 1, 2022
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment