Day 7, April 3, 2012 the front bathroom completed except for mirror. The handles were put on to the cabinet. Charlie, Leonardo and Bernardo arrived at 8:15 and left at 4:00.

The bathroom tiles and fixtures cleaned and the rod for the curtain put in place.

The doorstop fixed in place.

The clothes hook attached.
Faucet holes drilled and plumbing connected. Sink and counter connected and in place.

Everything was sealed floor grout and sinks.
The back bathroom was completely demolished.
No comments:
Post a Comment