Friday, March 1, 2024

Bathroom Remodel Day 1

 See original post Feb. 1, 2022 for pictures.

March 26, 2012 Charlie, Abel and Fernando arrived at 10:00 a.m. They proceeded to remove everything from the bathroom, toilet, fixtures sink and cabinets. They tested the toilet and it was plugged up. They removed the top of the linoleum flooring to reveal the base boards and determined there was no damage to any of the wood below. 

 

 They left about 2:00 and then Linda and I went to Bed Bath and Beyond and also Target to get towel holders 2 sizes, toilet paper holder, waste paper baskets and hooks for the door.

No comments:

Related Posts Widget for Blogs by LinkWithin